top of page

CASTING

Once the investments are cool enough to be handled (around 300 - 400°C), they are placed in a bed of sand to support them.

Meanwhile, the bronze is being melted in a furnace.

 

Once the metal reaches 1200°C, it is ready to be poured into the ceramic shell investment. This is done by decanting the metal into a pre heated small pot - a crucible - and then poured into the investment at a reasonable speed.

 

The investments, now filled with bronze, are left to cool until the following day.

OPENING HOURS:

Monday - Friday

8:30am - 5:00pm

Saturday & Sunday

Closed

Small AB Fine Art logo

AB Fine Art Foundry Ltd
1 Fawe Street
London
E14 6PD

AB Fine Art telephone call icon
AB Fine Art email icon
AB Fine Art instagram icon

QUICK LINKS:

​

Copyright © 2023 AB Fine Art Foundry Ltd

bottom of page